Customization: | Available |
---|---|
Certification: | CE, ISO, CE, ISO |
Customized: | Customized, Customized |
Suppliers with verified business licenses
No. | Description | Unit | Parameter | |
1 | CCM Type | / | Fully Arc Radius Continuous Casting Machine ( Continuous Straightening) | |
2 | Arc Radius | mm | 6,000 | |
3 | Strands | / | 1 x 3 x 3 | |
4 | Strands Gap | mm | 1200 | |
5 | Casting Billet Size | mm×mm | 150 x 150 | |
6 | Billet Fixed Length | mm | 3,000 -6,000 | |
7 | Dummy Bar Type | / | Rigid Dummy Bar | |
8 | Shearing Method | / | 450 Billet Hydraulic Shear | |
9 | Casting Speed | Working Speed |
Max Speed |
|
150 x 150 Crystallizer |
m/min | 2.2 - 2.6 | 2.9 | |
130 x 130 Crystallizer |
m/min | 2.5 - 3.0 | 3.5 | |
11 | Crystallizer Length | mm | 900 | |
12 | Roller Table Elevation Height | mm | ||
13 | Casting Steel Type | / | Common Carbon Steel, Low Alloy Steel | |
14 | Annual Capacity | t | 100,000 / strand |
Specification and Technical Parameter
|
||||
Main Parameter
|
R2.25M
|
R4M
|
R5.25M
|
R6M
|
Power
|
95KW
|
|||
Billet Size
|
60-80 square
|
90-150 square
|
90-180 square
|
90-220 square
|
Flow
|
One flow or multi-flow according to customer's requirements
|
|||
Working Speed
|
Adjustable. Normal working: 4-4.7M/min
|
|||
Cutting Method
|
Manual / Mechanical / Flame cutting
|
|||
Production Capacity
|
4-8T/Hour/ Flow
|
8-20T/Hour/Flow
|
8-30T/Hour/Flow
|
8-50T/Hour/Flow
|
Workshop Lifting height
|
6M
|
9M
|
9-12M
|
9-12M
|
No. | Machinery Item | QTY | U.W ( T) |
T.W (T) |
Remarks |
1 |
Turret Ladle | 1 | 55 | 55 | A |
2 |
Tundish | 4 | 3.2 | 12.8 | |
3 |
Tundish Membrane | 1 | 0.75 | 0.75 | |
4 |
Tundish Car | 2 | 8.5 | 17 | |
5 |
Rotate Operating Box | 3 | 0.65 | 1.95 | |
6 |
Overflow Groove | 3 | 0.4 | 1.2 | |
7 |
130x130 Crystallizer | 3 | 0.6 | 1.8 | B |
8 |
150x150 Crystallizer | 3 | 0.6 | 1.8 | B |
9 |
Crystallizer Cover | 3 | 0.4 | 1.2 | |
10 |
Oscillation Mechanism | 3 | 1.6 | 4.8 | |
11 |
Oscillation Beam | 1 | 2.1 | 2.1 | |
12 |
Spraying Tube | 3 | 0.3 | 0.9 | C |
13 |
Section Guider | 3 | 1.2 | 3.6 | D |
14 |
Straightening & Withdrawing Machine ( S&W Machine ) | 3 | 5.3 | 15.9 | E |
15 | S&W Beam | 2 | 1.6 | 3.2 | |
16 |
Dummy Bar Assembly | 3 | 1.6 | 4.8 | F |
17 |
Dummy Bar Storage | 3 | 2.2 | 6.6 | |
18 |
Metal Proximity Sensor Fixed Length Mechanism |
3 | 0.1 | 0.3 | |
19 |
Pre-Shear Roller Table | 3 | 1.3 | 3.9 | |
20 |
After Shear Roller Table | 3 | 2.6 | 7.8 | G |
21 |
Transfer Roller Table | 3 | 2.6 | 7.8 | G |
22 |
Billet Run-Out Roller Table | 1 | 7.2 | 7.2 | H |
23 |
Rack Type Pusher | 1 | 18 | 18 | |
24 |
Billet Cooling Bed | 1 | 2.6 | 2.6 | |
25 |
Crystallizer Maintenance Storage Device | 1 | 0.7 | 0.7 | |
26 | Steam Exhaust | 1 | 1.5 | 1.5 | I |
27 | CCM Water Cooling System | 1 | 6 | 6 | J |
28 | Hydraulic System | 1 | |||
29 | Electrical Control System | 1 | |||