40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv

Product Details
Customization: Available
Certification: CE, ISO
Customized: Customized
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2007

Suppliers with verified business licenses

Type of Ownership
Limited Company
Plant Area
>2000 square meters
  • 40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv
  • 40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv
  • 40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv
  • 40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv
  • 40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv
  • 40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv
Find Similar Products

Basic Info.

Model NO.
Arc furnace
Surface Treatment
Painted
Fuel
Gas Coal Electric
Range of Applications
Industrial
Type
Cusomized
Place Style
Vertical
Usage
Steel Molding
Structure
Horizontal Type
Brand
Ville Industry
After-Sales Service
Online Service
Warranty
18monthes
Transport Package
Nude, Wooden Cases
Specification
As per drawing
Trademark
Ville Industry
Origin
China
HS Code
851300020
Production Capacity
30units Per Year

Product Description

1. Technical parameter
1.1 Furnace capacity
      Nominal tapping capacity                                40t
      Average tapping capacity                                50t (Hot heel: 6-8t)
      Tap to tap time(tap 50t liquid steel)                 70 mins. (100% scrap, 2 times top charging)
      Method of charging                                         Top (using charging buckets and hopper)
      Method of tapping                                           EBT
1.2 Furnace body
      Shell internal diameter                                     Ф4800mm
      Side wall construction                                     Water cooled ,tubular
      Forward tilting angle (steel tapping)                20°
      Backward tilting angle (slag tapping)              12°
      Roof construction                                            Water-cooled, tubular
      Roof lifting distance                                        400mm
      Roof rotation angle                                          65°
      Furnace door size                                             1000mm×900mm (W×H)
1.3 Heavy current system
      Electrode diameter                                           Ф500mm (UHP)
      Pitch circle diameter                                        Ф1200mm
      Electrode lifting distance                                 3100mm
      Electrode traveling speed                                9 / 6m/min (up/down, hydraulic driven)
      Short net Impedance                                        ≤0.65+j3mΩ
     Three phase unbalance                                     ≤5%

1.4 Furnace transformer & series reactor
      Transformer capacity                                        32MVA+20% (long term)
      Primary voltage                                                20kV, 3P, 50Hz
      Secondary voltage                                           650-500-350V (15 taps, ABB tap changer)
      Secondary current                                            36950A
      Cooling mode                                                  OFWF
      Reactor capacity                                              6MVar
      Reactor tap                                                       100%, 70%, 50%, 25%, 0%
1.5 Hydraulic system
      Hydraulic working pressure                             12MPa
      Hydraulic medium                                           Water-glycol (Buyer's scope)
1.6 Cooling water
      Water pressure                                                  0.4MPa
      Inlet water temperature                                    ≤35ºC
      Outlet water temperature                                 ≤55ºC
      Total water circulation flow                             600 t/h
      Emergency water                                             300 t (for 30mins. @ 0.25MPa)
      Water quality                                                    Industrial clean water
1.7 Lance & carbon injection system
     Oxygen working pressure                                0.8-1.0MPa
     Oxygen flow rate                                             2900Nm3/h (max.)
     Oxygen nozzle speed                                       2 Mach
     CNG working pressure                                    0.4MPa
     CNG flow rate                                                        800Nm3/h (max.)
     Compressed air working pressure                    0.8MPa
     Compressed air consumption                           600Nm3/h (max.)
     Carbon powder consumption                           20-30kg/min.
1.8 Others
      L.V. power installation capacity                      100kW
      Furnace shell weight                                        105t (with refractory lining)


2. Supply list & break down price list
SN Item Qty Remark
1 Mechnical parts    
1.1 Furnace body (upper shell and lower shell) 1 set  
1.2 Tilting mechanism 1 set  
1.3 Water cooled roof and water pipe 1 set  
1.4 Roof lifting and rotating mechanism 1 set  
1.5 Electrode arms and traveling mechanism 1 set  
1.6 EBT platform 1 set  
1.7 Rotation frame locking device 1 set  
1.8 Electrode nippling station 1 set  
1.9 Cooling water distributor 1 set  
2 Electrical parts    
2.1 Transformer 32MVA/20kV c/w cooler 1 set ABB tap changer
2.2 Reactor 6MVar/20kV c/w cooler 1 set  
2.2 20kV high voltage system (GBC40.5kV panel) 1 set VCB
2.3 Short network with water cooled cables 1 set  
2.4 Lower voltage system 1 set  
2.5 PLC automation and HMI system 1 set Siemens PLC S7-300
3 Auxiliary items    
3.1 Hydraulic power pack 1 set Proportional valve & pump make: Parker
3.2 Compressed air device 1 set  
3.3 Lubrication station 1 set Xi'an or Qidong
3.4 Water cooled door oxygen lance manipulator 1 set with hydraulic station
3.5 CNG, oxygen, carbon wall lance (4 pcs.) 1 set with valves stand
3.6 Steel temperature & measuring thermometer 1 set with LED display
4 Others (packing, china trans., customs, etc) 1  
  FOB china port price  

Supplied by the Buyer:
1) Installation and installation materials, Hydraulic medium, lubrication medium and cleaning medium, Graphite
    electrodes, Furnace refractory lining;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded
    furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is
    connected to Seller's H.V. panel and furnace transformer terminals, L.V. line is connected to Seller's L.V.
   distribution panel.


3. Delivery: 6 month after the Seller receiving down payment.

Workshop


40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv

40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv


Sales team:
40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier