SN |
Equipment |
Spec. |
A-Steelmaking process equipment |
I |
Scrap bay |
|
|
40t/10t bridge crane |
Lk=22.5m, A6 with magnetic disc |
|
16t/3.2t bridge crane |
Lk=22.5m, A6 with crab |
|
100t rail weigher |
|
|
80t electrical flat car |
Rail distance: 2000mm , Stroke: 30m |
|
Scrap bucket |
Bottom open V=65m3 |
|
Scrap bucket hanger |
For scrap bucket |
|
3t maintenance hoist |
CD1, H=18m |
II |
Melting bay |
|
1 |
Crane |
|
|
150t/50t double girder metallurgical crane |
Lk=26.5m,A7 |
|
80t/20t/5t bridge crane |
Lk=26.5m,A7 |
|
3t maintenance hoist |
CD1, H=30m |
2 |
70t EBT UHP Electric arc furnace |
|
|
Furnace shell |
|
|
Furnace roof |
|
|
Seat, platform, tilting mechanism |
|
|
Maintenance platform |
|
|
Electrode nippling device |
|
|
Roof lifting & rotating mechanism |
|
|
Column |
|
|
Electrode arm |
|
|
Water cooled cables |
|
|
Short net |
|
|
Furnace transformer |
HSSPZ-56000KVA/33KV |
|
Series reactor |
9000KVar/33kV |
|
H.V. switchboard |
GBC-40.5KV |
|
L.V. power distribution & cotrol panel |
|
|
PLC panel |
Siemens PLC S7-300 |
|
HMI & software |
WinCC + Step 7 |
|
Hydraulic power pack |
|
3 |
80t Ladle Furnace |
|
|
Roof |
|
|
Roof lifting & rotating mechanism |
|
|
Electrode nippling device |
|
|
Column |
|
|
Electrode arm |
|
|
Water cooled cable |
|
|
Short net |
|
|
Furnace transformer |
HSSPZ-12000KVA/33KV |
|
H.V. switchboard |
GBC-40.5KV |
|
L.V. power distribution & cotrol panel |
|
|
PLC Panel |
Siemens PLC S7-300 |
|
HMI & software |
WinCC + Step 7 |
|
Hydraulic power pack |
|
|
Ladle car & drawing cable |
|
4 |
Furnace auxiliary equipment |
|
|
EAF door lance manipulator |
Oxygen: 4000Nm3/h |
|
EAF wall lance |
Oxygen: 1000Nm3/h, CNG: 300Nm3/h |
|
Horizontal ladle preheater |
JHK-80-2 |
|
Vertical ladle preheater |
JHK-80-1 |
|
Scrap bucket hanger |
|
|
80t electrical flat car |
Rail gauge: 1435mm , Stroke: 20m |
|
Ladle |
80t |
|
Ladle hanger |
|
|
Wire feeder |
WX-4BF, double wires |
|
Shell sling |
|
|
EAF refractory gunning machine |
|
5 |
EAF materials charging system |
|
|
DRI bin & weighing system |
|
|
Bulk material bin & weighing system |
|
|
Auxiliary material hopper & weighting system |
5m3 |
|
Conveyor & transportation system |
|
|
EAF charging hopper & chute |
|
|
LF charing hopper & chute |
|
|
Power distribution panel |
|
|
PLC |
Siemens PLC S7-300 |
III |
Casting bay |
|
1 |
R6m 5 strands billet CCM |
120 sq.mm & 150 sq.mm billets |
|
Ladle turret |
|
|
Tundish car |
|
|
Tundish |
|
|
Mold |
120 sq.mm & 150 sq.mm |
|
Overflow chute & slag pot |
|
|
Secondary cooling part |
|
|
Withdrawal straightening machine |
|
|
Guide roller |
|
|
Dummy bar |
|
|
Dummy bar storage device |
|
|
Flame cutting machine |
|
|
Cut to length device |
|
|
Roller after cutting |
|
|
Billet pusher |
|
|
Billet storage unit |
|
|
Power distribution panel |
|
|
VVVF panel |
|
|
PLC panel |
|
|
HMI unit & software |
|
|
Instrument |
|
2 |
Others |
|
|
Off line & maintenance equipment |
Tundish rack, mold repairation rack |
|
5t Column cantilever crane |
R=5m, H=10m |
|
50t/10t bridge crane |
Lk=28.5m, A6 |
|
3t maintenance hoist |
CD1, H=18m |
|
50t electrical flat car |
Rail gauge: 1435mm , stroke: 20m |
|
Tundish |
|
|
Ladle hanger |
70t ladle |
IV |
Billet bay |
|
|
20t/5t bridge crane |
Lk=28.5m, A6, one set with grab |
|
Billet sling |
|
B-Factory power distribution system |
I |
Power distribution system |
|
|
H.V. panel |
40.5KV |
|
H.V. panel |
12KV |
|
Microcomputer protection device |
|
|
DC panel |
DC220V |
|
Power transformer |
S11 2000kVA, for water treatment plant |
|
Power transformer |
S11 1600kVA, for main melt shop |
|
Power transformer |
S11 1000kVA, for oxygen plant, compressor |
|
Power transformer |
S11 800kVA, for lighting |
|
L.V. power distribution panel |
|
|
Junction box |
XLL2 type or XL-21 type |
C-Air separaton part |
I |
KDOAr-3200/80Ar air separation plant |
Oxygen purity: 99.6% |
|
Air filter |
|
|
Precooling unit |
|
|
Air compressor |
|
|
Piping after compressor |
|
|
Cold box |
|
|
Heater |
|
|
Expension machine |
|
|
Oxygen compressor |
Pressure: 3.0MPa |
|
Nitrogen compressor |
|
|
Cryogenic liquid pump |
Pressure: 3.0/15.0Mpa. |
|
Oxyge, nitrogen bottle filing device |
100Nm3/h, pressure: 15MPa |
|
Oxygen control valve group |
P=3.0MPa/1.6MPa |
|
Nitrogen control valve group |
P=3.0MPa/1.6MPa |
|
Oxygen storage tank |
200m3 |
|
Nitrogen storage tank |
100m3 |
|
Argon storage tank |
20m3 |
|
H.V. switchboard |
|
|
Starter panel |
|
|
L.V. power distribution panel |
|
|
PLC panel |
|
|
HMI station & software |
|
|
Instrument |
|
II |
Bridge crane |
Q=20t/5t, Lk=15m, H=9m |
III |
Compressor |
|
|
Water cooled screw compressor |
LGD-185/347E type, Q=20m3/min, P=0.8MPa |
|
Air holder |
C-6/0.8 type, V=4m3;P=0.8Mpa |
|
NS energy storage type cold dryer |
Q=20m3/min, with purifier |
|
|
|
D-Fume extraction part |
I |
Dedusting system |
|
|
EAF canopy & accessory |
|
|
Canopy pipe |
|
|
EAF Main fume pipe |
100m |
|
LF fume pipe |
30m |
|
EAF water cooled fume pipe |
55m Φ1800 |
|
LF water cooled fume pipe |
25m Φ700 |
|
Fume reversal cylinder |
|
|
Mixer valve |
|
|
Regulating valve |
|
|
Dust collector |
15000m2 |
|
Filter bag and bag case |
Φ160*6500 , around 4650pcs. per set |
|
Dust discharge valve |
|
|
Dust conveyor |
|
|
Blower |
60Nm3/h |
|
Fluid couplier |
|
|
Main motor |
1250kW 10KV |
|
Chimney |
|
|
H.V. switchboard |
|
|
Starter panel |
|
|
L.V. power distribution panel |
|
|
PLC panel |
Siemens PLC S7-300 |
|
HMI station & software |
WinCC + Step 7 |
|
Instrument |
|
E-Water treatment plant |
I |
Water treatment system |
|
|
Mold cooling water pump |
Q=300m3/h, H=125m, N=160kW |
|
EAF & LF, fume duct water pump |
Q=700m3/h, H=60m, N=160kW |
|
Emergency water pump |
Q=600m3/h, H=50m, N=110kW |
|
Cooling tower pump |
Q=600m3/h, H=25m, N=55kW |
|
CCM secondary cooling water pump |
Q=180m3/h, H=125m, N=90kW |
|
CCM cooling water pump |
Q=120m3/h, H=60m, N=30kW |
|
Mud circulation clean pump |
Q=400m3/h, H=30m, N=55kW |
|
CCM secondary sedimentation tank pump |
Q=400m3/h, H=40m, N=75kW |
|
CCM primary sedimentation tank pump |
Q=300m3/h, H=25m, N=55kW |
|
Oxygen plant cooling water pump |
Q=350m3/h, H=65m, N=75kW |
|
Submersible sewage pump |
Q=15m3/h, H=12m, N=1.1kW |
|
Counterflow type FRP cooling tower |
Q=1000m3/h,T1<50ºCT2<35ºC,N=30kW |
|
Counterflow type FRP cooling tower |
Q=465m3/h,T1<50ºCT2<35ºC,N=22kW |
|
Sewage counterflow type FRP cooling tower |
Q=300m3/h,T1<50ºCT2<35ºC,N=18.5kW |
|
High speed filter |
Q=210m3/hV=40m/s, Φ2600mm |
|
Automatic pipe filter |
Q=1450m3/h, N=1.1kW, PN=1.6MPa |
|
Automatic pipe filter |
Q=1000m3/h, N=1.1kW, PN=1.6MPa |
|
Automatic pipe filter |
Q=500m3/h, N=0.75kW, PN=1.6MPa |
|
Automatic pipe filter |
Q=300m3/h, N=0.37kW, PN=1.6MPa |
|
Sediment scraper |
Lk=8.3m, H=4.0m, N=~8.0kW |
|
Electrostatics water treating device |
Q=1100-1399m3/h, DN450, PN=1.6MPa, N<30W |
|
Air holder |
V=2.0m3, ¢1000mm |
|
Water quality dosing device |
N=0.75+0.37kW |
|
Automatic water softening device |
Q=15-20m3/h, water hardness<0.1°dH |
|
Slow close/open multi function valve |
DN150-400 |
|
Float ball valve |
PN=1.0MPa |
|
Single girder bridge crane |
Q=3t, Lk=5m, lift stroke: 6m |
|
Single rope grab |
V=0.5m3 |
|
L.V. power distribution panel |
|
|
PLC panel |
Siemens PLC S7-300 |
|
HMI station & software |
Advantech industrial computer |
|
Instrument |
|
|
Junction box |
|
F-33KV Compensation system(SVC) |
|
SF6 breaker panel |
|
|
Disconnector |
|
|
Lightning arrester group |
|
|
Filter resistance & capacitor bank |
|
|
Filter reactor |
|
|
Current transformer |
|
|
Compensation capacitor |
Total capacity: 75MVar |
|
TCR & control unit |
|
|
Wall bushing |
|
|
Busbar |
|
|
L.V. panel |
|
|
PLC & HMI |
Siemens PLC S7-300 |
|
Pure water device |
|
|
Accessory |
|
G-Quick laboratory equipment |
|
Rapid sample cutter |
|
|
Bench driller |
Max. drilling hole: Ф15mm |
|
Automatic milling machine |
|
|
Grinder with dust collector |
Wheel dia: Ф200mm |
|
Infared CS analyzer |
Measuring: c:0.002~3.0% s:0.002~0.35% |
|
Vacuum direct read spectrolab |
Wave length: 130~850mm, 15 channels |