Introduction:
DRI is received in storage pit, and loaded to storage bin by vertical lift & distributor, then transferred to
overhead bin by angle belt conveyor, finally, is charged into EAF by revolving chute.
Alloy material and slag former be loaded into material storage bin by charging bucket, needed material is
charged into weighing hopper through vibrating feeder, then loaded on belt conveyor by vibrating feeder,
and is charged into ladle through belt conveyor and charging pipe in heating bridge.
Weighing sensor output signal is displayed in console room when system working, vibrating feeders can
working in PLC control auto and manual mode.
Supply list
CN |
Description |
Model |
Qty |
Remarks |
A |
DRI continuous charging device |
|
1 set |
|
1 |
Vertical lift |
25m |
2 sets |
|
2 |
Belt conveyor |
W=650mm, L=25m |
1 set |
|
3 |
Electrical material distributor |
|
1 set |
|
4 |
Storage bin with plate valve |
|
6 sets |
Steel structure |
5 |
Collecting hopper |
|
3 sets |
|
6 |
Weighing belt |
|
6 sets |
|
7 |
Belt conveyor |
W=500mm, L=35m |
1 set |
|
8 |
Angle belt conveyor |
L=25m |
1 set |
|
9 |
Overhead material bin |
|
1 set |
Steel structure |
10 |
Electrical revolving chute |
|
1 set |
|
11 |
Damper & support |
|
18 t |
Steel structure |
|
B |
Alloy & slag former charging device |
|
1 set |
|
1 |
Alloy material & lime storage bin |
5m3 |
8 sets |
Steel structure |
2 |
Vibrating feeder |
|
8 sets |
|
3 |
Weighing hopper |
1.5m3 |
2 sets |
|
4 |
Reversible belt conveyor |
|
1 set |
|
5 |
Electrical revolving chute |
|
1 set |
|
6 |
Damper & support |
|
1 set |
Steel structure |
|
|
|
CNY |
|
C |
Electrical control system |
|
1 set |
|
1 |
PLC control system |
Siemens S7-315 |
1 set |
|
2 |
Industrial computer & programming |
WinCC + Step7 |
1 set |
Advantech |
3 |
Power distribution panel |
|
2 sets |
|
4 |
VVVF driver panel |
Siemens |
2 sets |
|
5 |
Field junction box |
|
6 sets |
|
Note: Supply scope will be determined after primary design with consultant, so final price may be
revised.
Delivery: 4 month after the Seller receiving down payment.